The street resurfacing portion consists of hot-mix asphalt surface removal and resurfacing. This
Portion also includes concrete curb and gutter removal and replacement, pavement milling,
Sidewalk removal and replacement, pavement resurfacing, pavement patching, adjustment of
Structures, storm sewer installation, structure replacements, and all collateral work necessary
To complete the project as described herein. Resurfacing and repairs at 3 city-owned parking lots
are also part of this project.
Sidewalk replacement program shall consist of the removal and replacement of existing sidewalk
And curb in need of repair throughout the City of Batavia. There are typically 1 to 5 sidewalk panels
At each location. The city-wide repairs are located beyond the limits of the street resurfacing
Work. Individual locations are shown on the location map and the location list.