Illinois Bids > Bid Detail

Wetland Permit Work Construction at Fermilab

Agency: ENERGY, DEPARTMENT OF
Level of Government: Federal
Category:
  • F - Natural Resources and Conservation Services
Opps ID: NBD00159930361124423
Posted Date: May 16, 2023
Due Date: May 26, 2023
Solicitation No: LBNF-342297-BWQ
Source: https://sam.gov/opp/c335bf0824...
Follow
Wetland Permit Work Construction at Fermilab
Active
Contract Opportunity
Notice ID
LBNF-342297-BWQ
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
FERMILAB - DOE CONTRACTOR
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: May 15, 2023 06:54 pm CDT
  • Original Published Date: Apr 20, 2023 07:32 pm CDT
  • Updated Date Offers Due: May 26, 2023 05:00 pm CDT
  • Original Date Offers Due: May 19, 2023 05:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Jun 10, 2023
  • Original Inactive Date: Jun 03, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: F113 - ENVIRONMENTAL SYSTEMS PROTECTION- WETLANDS CONSERVATION AND SUPPORT
  • NAICS Code:
    • 23891 - Site Preparation Contractors
  • Place of Performance:
    Batavia , IL 60510
    USA
Description

This Solicitation is for Wetland Permit Work located on-site at Fermilab and is comprised of the following elements. The Subcontractor’s scope of work is not limited to the general work outline described below. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and specifications.





Tree Clearing



Tree Clearing includes clearing, grubbing, tree and shrub protection, debris removal, surveying and accessories necessary for Tree Clearing for the areas in accordance with the Contract Documents. Tree Clearing shall wholly occur between November 15 and March 15.





Site Work



Site Work includes excavation, grading and stockpiling of wetland materials in all Temporarily and Permanently Impacted Areas as indicated on the Contract Documents, lined channels with outlets, surveying, silt fencing, erosion control blankets, riprap and accessories necessary for a complete installation.





Please see the attached RFP files for more information.



The anticipated period of perfomance for this work is November 2023 through March 2024.



This is a small business set-aside; only firms certifying to be small businesses will be considered for award.





Important dates and times:



Mandatory Pre-proposal Conference via Zoom: May 4th, 2PM via Zoom. Please e-mail the solicitation contact with anticipated attendence list by April 28. Zoom link is in solicitation documents. Zoom meeting will be recorded.



Questions due: May 12th, 2023.



Proposals Due: 5PM, Friday, May 19th 2023.



FRA intends to schedule OPTIONAL site visits prior to May 12th; notification will be provided via addenda to this SAM.gov posting with more details.





ADDENDUM 1: Issued directly to attendees of mandatory pre-proposal conference, is being attached. Adddendum 1 includes information from the pre-proposal converence and information on an optional site visit May 11.



ADDENDUM 2: Adddendum 2 includes information pertaining to the removal of quality requirements previously included in the RFP and pre-proposal presentation.



ADDENDUM 3: Adds a Fully Burdened Rate Form and revised Mandatory Requirements Checklist to reflect this addition. Fully Burdened Rate Form is for suppliers to indicate fully burdened rates which may be used for the purposes of estimating and evalauting pricing for future potental change orders and not part of the RFP pricing evaluation.



ADDENDUM 4: Provides Q&A Document, changes to RFP, and changes Proposal Due Date to 5/26/2023.


Attachments/Links
Contact Information
Contracting Office Address
  • Kirk Rd. & Pine St.
  • Batavia , IL 60510
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >