Illinois Bids > Bid Detail

Construction Projects for Agency

Agency: State Government of Illinois
Level of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Opps ID: NBD14067700615582605
Posted Date: Jun 29, 2020
Due Date: Jul 3, 2020
Solicitation No: 21-586SBE-FINAN-B-16049
Source: https://www.bidbuy.illinois.go...
Bid Solicitation: 21-586SBE-FINAN-B-16049
Header Information
Bid Number: 21-586SBE-FINAN-B-16049 Description: Construction Projects for Agency Bid Opening Date: 07/03/2020 12:00:00 PM
Purchaser: Jessica Crum Organization: SBE - State Board of Education
Department: OPERATIONS586 - Operations Location: 014AA - Facility Management
Fiscal Year: 21 Type Code: 95 - Small Purchase Allow Electronic Quote: Yes
Alternate Id: Required Date: 07/01/2020 Available Date : 06/29/2020 02:29:58 PM
Info Contact: jcrum@isbe.net Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Open Market
Pre Bid Conference:
Bulletin Desc: Construction Projects for Agency
Ship-to Address: Central Receiving Center
100 North First Street, Concourse
Springfield, IL 62777
US
Email: spower@isbe.net
Phone: (217)555-5555
Alt. Reference: jcrum@isbe.net
Bill-to Address: Central Receiving Center
100 North First Street, Concourse
Springfield, IL 62777
US
Email: spower@isbe.net
Phone: (217)555-5555
Alt. Reference: jcrum@isbe.net
Print Format: Bid Print New
File Attachments: Standard Certifications
Standard Terms and Conditions
Blank Forms A
RFQ Specifications
Blank Forms B
Form Attachments:
SPO Name: Kassandra Wilkin
Is this a Small Business Set Aside Procurement?: No
Is there a BEP/VBP Participation Goal? : No
Link to Original Contract :
Item Information
1-5 of 8
1 2
Item # 1: The Illinois State Board of Education (ISBE) is seeking a construction contractor for routine carpentry projects on an as-needed basis throughout the Springfield Office. The vendor must be responsible for but not limited to office buildouts including framing, manufactured drywall installation/removal, painting, door removal/installation, and carpet tile patching. Contractor must have four (4) years of experience with projects of similar size and scope. The contractor shall provide all personnel, materials, and equipment necessary to fulfill each project request. The contractor must have materials pre-approved by the ISBE Facility Management Director. Expenses: The Contractor must propose an hourly rate, inclusive of materials needed, or each line item listed below. Contractor agrees to pay prevailing wage rates, benefits, and conditions prevalent in the location where the work is to be performed, as determine by the Illinois Department of Labor. No travel expenses allowed. Quote must include hourly rates, including materials, for the following: Framing (65 estimated hours) Manufactured Drywall Installation (65 estimated hours) Manufactured Drywall Removal (65 estimated hours) Painting (5 estimated hours) Door Removal (20 estimated hours) Door Installation (15 estimated hours) Carpet Tile Patching (15 estimated hours) Effective Dates: The term of this contract will be from July 1, 2020 or upon execution, whichever is later, through June 30, 2021 (with an estimated 250 hours total work during this time period). Quotes Must Include: Completed Forms A & Standard Certifications, if NOT registered in IPG Completed Forms B & Standard Certifications, if registered in IPG All-inclusive hourly rate Separate attachment verifying required previous experience Bids must be submitted electronically
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
This item is narrative
Item # 2: ( 914 - 88 ) Framing for office build-outs, including materials
NIGP Code: 914-88
Wood, Includes Architectural Woodwork
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
65.0 HR - Hour
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code :

Item # 3: ( 909 - 45 ) Manufactured Drywall Installation , including materials
NIGP Code: 909-45
Finishes, Flooring, Wall and Ceiling, etc.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
65.0 HR - Hour
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code :

Item # 4: ( 909 - 45 ) Manufactured Drywall Removal, including materials
NIGP Code: 909-45
Finishes, Flooring, Wall and Ceiling, etc.
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
65.0 HR - Hour
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code :

Item # 5: ( 914 - 61 ) Patchwork Painting, including materials
NIGP Code: 914-61
Painting and Wallpapering
Qty Unit Cost UOM Total Discount Amt. Tax Rate Tax Amount Total Cost
5.0 HR - Hour
Manufacturer: Brand: Model:
Make: Packaging:

Additional NIGP Code :

1-5 of 8
1 2
ILL-PAS4

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >